International Engineering

Design Optimization and Consultancy Services for the Third Shitalakhya Bridge in Bangladesh.

Jan 28,2021

Hits:-

Design and Consulting, since February, 2019

The designed bridge is 1309 meters long and 22.15 meters wide.

Design Optimization and Consultancy Services for the Third Shitalakhya Bridge in Bangladesh.

Design Optimization and Consultancy Services for the Third Shitalakhya Bridge in Bangladesh.