Bridge Engineering
South to North Water Diversion Bridge on Wuzhi-Yuntaishan Expressway
Feb 09,2021
Hits:-
The bridge is a single tower cable-stayed bridge with a main span of 175 meters. It is the first bridge after the main canal of the south to North Water Diversion Project is connected with water, and the first cable-stayed bridge on Henan expressway.